Guide ·
Torpedo Heater Safety: Ventilation, Placement and Refueling

Torpedo heater safety work starts with a discipline that sounds bureaucratic and is anything but: name the exact model, then work from its manual. This checklist helps you request the right documents, record the specifications and organize the questions for whoever approves the site plan. The official references at the end are general reading. They sit alongside the model-specific review — they never replace it.
Get the safety documentation before the heater ships
Which manual version accompanies the proposed model? What does it require for placement, ventilation, clearances, fuel handling and electrical connections — and who approves the arrangement on your site? Which instructions will the operators actually have in their hands? Record the answers against the model code, and ask the supplier to flag any document still outstanding. A safety file assembled after delivery is a safety file assembled too late.
Read the control entries literally
The diesel models in the table have continuous spark ignition and a thermostat. ZB-G60A has electronic ignition and a thermostat. Request ignition and safety-device details for ZB-G35T. Ask for protective-device specifications and inspection instructions for each model separately from output and consumption. Safety equipment you have assumed is safety equipment you do not have.
Operating and service questions, answered in advance
Request the refueling procedure for your model. Which inspections and maintenance steps should ship with the unit, and who reviews ventilation and carbon-monoxide monitoring requirements for your site? What governs taking a unit out of service? Get the model-specific procedure and the applicable site requirements in writing before anyone writes an operator checklist from memory. Memory is where refueling mistakes come from.
Model specification comparison
Compare heat output, fuel, power supply and other specifications for each model. Keep units and qualifiers attached to every value. Ask us for further specifications by model code, and record output settings, consumption, coverage and supply separately.
| Model | Heat output | Fuel | Power supply | Fuel tank / cylinder | Fuel consumption | Heating volume / area | Airflow | Ignition / control | Product size | Net / gross weight |
|---|---|---|---|---|---|---|---|---|---|---|
| ZB-K175 | 51 kW (175,000 BTU) | Kerosene, diesel | 110V / 60Hz, 220V / 50Hz | 50 L | 4.8 L/h | 1,020 m³ | On request | Continuous spark ignition; thermostat | 1060 × 540 × 575 mm | 22.3 / 25.8 kg |
| ZB-H100 | 30 kW (100,000 BTU) | Kerosene, diesel | 110V / 60Hz, 220V / 50Hz | 50 L | 2.9 L/h | 480 m³ | On request | Continuous spark ignition; thermostat | 1100 × 550 × 600 mm | 30.5 / 33.6 kg |
| ZB-K350 | 100 kW | Kerosene, diesel | 220V / 50Hz | 70 L | 9.8 L/h | 2,000 m³ | On request | Continuous spark ignition; thermostat | 1310 × 500 × 750 mm | 52 / 56.5 kg |
| ZB-G35T | 12–30 kW (adjustable) | LPG / propane | 220V / 50Hz | On request | 0.86–2.16 kg/h | On request | 440–600 m³/h | On request | 480 × 225 × 343 mm | 5.9 / 6.8 kg |
| ZB-G60A | 40,000–60,000 BTU | LPG / propane | 110V / 60Hz | On request | 0.83–1.25 kg/h | 234–352 m³ | 500 m³/h | Electronic ignition; thermostat | 486 × 198 × 335 mm | 5.6 / 6.6 kg |
Questions for the shortlisted models
ZB-K175
There are two voltage and frequency options, so name the version you want and ask for the connection instructions that belong to it. The model has continuous spark ignition with a thermostat; ask which manual pages explain those controls, and send any control questions you cannot close with the model code attached. A question labelled ZB-K175 gets answered for ZB-K175.
ZB-H100
This model runs on kerosene and diesel. Specify your chosen fuel and request its grade and filling instructions. If the quotation needs a running-time figure, ask for a documented one for this model and the conditions attached to it. Then let your reviewer work through the operating instructions before the price hardens into a decision.
ZB-K350
The heating entry is a volume, so ask what conditions it was rated under before it goes anywhere near a project. Your reviewer will want to say what site information travels with the model code — and the proposed application stays a question in that exchange, not a conclusion. Placement, ventilation and clearance instructions from the manual get checked before the selection is treated as final.
ZB-G35T
Regulator pressure is its own field here, separate from output and airflow, so ask which regulator and connection details accompany the offer. Request the supplied-component list for this code. Request cylinder, ignition and protective-device details for this model and include them in your site review.
ZB-G60A
This model has electronic ignition and a thermostat — ask which instructions explain those controls and what inspection information the manual provides. Then the fuel system: which components are included in the proposed order, and which cylinder and connection details are still unanswered? Keep the unanswered ones beside this code on the worksheet until they are not unanswered anymore.
Build the quotation worksheet
Structure the worksheet so the safety file builds itself: model code per column, printed fields first, then the documents requested — manual version, placement and clearance instructions, refueling procedure, inspection steps. Outstanding documents are listed as outstanding, with a name beside them.
Copy the heat row exactly, and keep control entries as literal as the sheet prints them. Request ignition and safety-device details for the exact model. Consumption figures stay consumption figures; nobody derives operating claims from them.
Buyer confirmation checklist
- Is the exact model code on every safety question?
- Which manual version accompanies the proposed unit?
- Have placement, ventilation and clearance instructions been reviewed?
- Are ignition and control specifications recorded accurately?
- Have you requested protective-device specifications for the exact model?
- What refueling, inspection and maintenance procedures ship with the unit?
- Who reviews ventilation and carbon-monoxide monitoring for the site?
- Which documents are still outstanding, and who is chasing them?
Follow up with the relevant specifications and guides
Safety review fans out from here: manuals, related models, the application guides. Follow the routes below with the model code named in every question you send.
Open Direct vs Indirect Diesel Heater: Which Do You Need?. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Open ZB-K175 specifications. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Open Diesel vs Kerosene: Which Fuel for a Forced Air Heater?. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Open Propane Forced Air Heaters. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Open Salamander vs Torpedo Heater: What Is the Difference?. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Open Torpedo Heaters. What is still unanswered about the proposed unit? Add it to the worksheet and request the documentation with your quote.
Questions to close before ordering
What should travel with the model code?
Quantity, compared fields, open entries — and the safety documentation list: manual version, placement and clearance instructions, refueling and inspection procedures, plus who approves the site arrangement.
How do we record a field nobody has answered?
On request. Request ignition and safety-device specifications for the exact model before ordering.
Can the official references replace the model manual?
They provide general context, and their scope deserves checking — but placement, ventilation and refueling for your unit come from its own manual.
Official references
The agency documents below are general reading, and worth an hour of your reviewer’s time. Which parts apply to the proposed equipment and your site is their call to make, checked against the exact model manual. Review the requirements alongside the specifications for your selected model.
Need model specs or factory pricing?
Get a Quote